Wisconsin · Illinois · Florida

Home / Case studies

Our problem-solving approach saves you time, money and hassles.

Leaking deck joints, corroded steel and post‑tension cables cut by a previous contractor. Here is what four of our projects involved.

Case studies

Four projects, four different problems.

For each project: what it involved, who the client was and where the work took place.

Technicians on a boom lift inspecting a masonry building wall for leaks

Leak investigations

Leak investigations are performed as a preventative measure to avoid more costly repairs, including drywall and flooring.

Client

Sand Lake

Location

Sand Lake

Crew saw-cutting and removing deteriorated concrete on a pre-cast double T parking deck

Pre-cast double T

Leaking joints in a double-T deck caused many headaches as corrosive salts leaked through and dripped onto cars.

Client

Major Medical Center

Location

Wisconsin

Crew squeegeeing traffic coating onto an open parking deck

Traffic coating

Corrosion in embedded steel caused delamination in the concrete. Spall repairs, sealant application and a monolithic waterproof traffic coating followed.

Client

General Mitchell Airport

Location

Wisconsin

Workers in hi-vis gear re-tensioning post-tension tendons in an opened concrete slab

Post-tension work

A previous, less experienced repair contractor had cut through post‑tensioned cables. Structure Werks uncovered the problem.

Client

Parking Structure

Location

Illinois

Client feedback

In our clients’ own words.

Our project was handled quickly and professionally, and the workmanship was excellent. I will use your firm again and would recommend you enthusiastically.

Structure Werks is great on problematic projects… [the] ones someone else didn’t do right. They’re very professional in the way they respond. They’re reliable, and they do what they say they’ll do. They’re also very easy to do business with. I’d certainly recommend them.

Here 4 2 Guarantee

We don’t walk away
when the job is done.

We won’t sign off on the job until you’re satisfied with the results. Every qualifying project is also backed by the Structure Werks Here 4 2 Guarantee, which has three parts.

Two-year guarantee

For qualifying projects, our work is guaranteed free from defects in workmanship or materials for two years.

Two free check-backs

Instead of waiting for a problem to crop up, we build two free post-job inspections into your project and address any defects we find.

Your project folder

A folder that summarizes the work and includes a schedule for annual inspections for the next two years.

Next step

Seeing cracks, spalls or leaks?

Have them fixed before a minor problem becomes a much bigger issue. Start with our free, no-obligation 6-point InspectionWerks: we inspect the structure, identify safety issues and potential structural problems, develop a repair concept and help you build the budget.